无法更新数据源凭据:找不到表的“budgetAmount”列 - Power BI Azure 成本管理连接器

[英]Failed to update data source credentials: The column 'budgetAmount' of the table wasn't found - Power BI Azure Cost Management Connector

I started using the Azure Cost Management Connector for Power BI.我开始使用用于 Power BI 的 Azure 成本管理连接器。 I could use it without an issue on Power BI desktop and import data into my report.我可以在 Power BI 桌面上毫无问题地使用它并将数据导入我的报告中。 However, when I published the report, it gives me the following error:但是,当我发布报告时,它给了我以下错误:

在此处输入图像描述

My report is pretty basic.我的报告很基础。 It only has Azure Cost Management Connector as a data source.它只有Azure 成本管理连接器作为数据源。 As far as the visuals go, I only have a simple table;至于视觉效果 go,我只有一个简单的表格; no transformations, no customizations whatsoever.没有任何转换,没有任何自定义。

But the problem is, I don't have any column named 'budgetAmount' any of my tables.但问题是,我的任何表都没有任何名为“budgetAmount”的列。 I tried "Edit Credentials" option in the Dataset section of the report in Power BI report.我在 Power BI 报告的数据集部分尝试了“编辑凭据”选项。 It successfully logs me in but then throws this error.它成功让我登录,但随后抛出此错误。 I'm only using the Usage Details from the Azure Cost Management connector.我只使用 Azure 成本管理连接器中的使用详情。

Has anyone else faced a similar situation?有没有其他人遇到过类似的情况?

02/24: This issue is fixed and rolled out, make sure to install the latest PBI desktop from here 02/24:此问题已修复并推出,请确保从此处安装最新的 PBI 桌面

https://www.microsoft.com/en-us/download/details.aspx?id=58494 https://www.microsoft.com/en-us/download/details.aspx?id=58494
在此处输入图像描述
------------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------- -------------------------------------------------- --------------------------
The issue happens because there is no budget available under the " Cost Management -> Budget ".出现此问题是因为“成本管理 -> 预算”下没有可用的预算。 Until we get out a fix the workaround for now is to add a test budget in the azure portal and the report should start working.在我们解决问题之前,目前的解决方法是在 azure 门户中添加测试预算,并且报告应该开始工作。

Steps to setup budget设置预算的步骤

https://docs.microsoft.com/en-us/azure/cost-management/tutorial-acm-create-budgets https://docs.microsoft.com/en-us/azure/cost-management/tutorial-acm-create-budgets

Ywp I have same issue. Ywp我有同样的问题。 Its because the cost management plugin pulls data from a table called Budgets, which has an error.这是因为成本管理插件从一个名为 Budgets 的表中提取数据,该表有错误。 You can bypass it in PowerBI desktop, but not if you want to schedule a data refresh in published power BI report.您可以在 PowerBI 桌面中绕过它,但如果您想在已发布的 Power BI 报告中安排数据刷新,则不能。 You can see this by going to query editor and selecting source on the RHS, then select the budgets row.您可以通过转到查询编辑器并在 RHS 上选择源,然后 select 预算行来看到这一点。 There is no way I found to filter this row out before or during it reading data from the source.在从源读取数据之前或期间,我发现无法过滤掉这一行。

Reference image:参考图片:

插图