简体   繁体   English

Power BI 无法处理数据集计划刷新中的错误

[英]Power BI Impossible to handle an error in dataset scheduled refresh

I am facing a problem with no response for now in Microsoft Power BI docs and different forums.我现在在 Microsoft Power BI 文档和不同的论坛中遇到了没有响应的问题。 I have a Power BI dataset scheduled refresh which it's not working and the showing message error is "Unable to connect to the data source undefined"我有一个 Power BI 数据集计划刷新,但它不起作用,并且显示消息错误是“无法连接到未定义的数据源”

The dataset is connected to an SQL database hosted in a server in which is correctly installed an On-premises Gateway.数据集连接到托管在正确安装了本地网关的服务器中的 SQL 数据库。 The connections are to the data sources are set correctly.与数据源的连接设置正确。

When the schedule refresh runs it fails every time, when we try to refresh manually it works!当计划刷新运行时,它每次都会失败,当我们尝试手动刷新时,它会起作用!

Does someone has faced this issue and how it can be handle?是否有人遇到过这个问题以及如何处理?

Thanks for your response!感谢您的答复!

When the refresh fails is the server online?刷新失败时服务器是否在线? I would also check to make sure to double check the credentials to the database in the gateway settings in Power Bi service.我还将检查以确保在 Power Bi 服务的网关设置中仔细检查数据库的凭据。

声明:本站的技术帖子网页,遵循CC BY-SA 4.0协议,如果您需要转载,请注明本站网址或者原文地址。任何问题请咨询:yoyou2525@163.com.

 
粤ICP备18138465号  © 2020-2024 STACKOOM.COM