具有相同调度的控制 M 个循环作业不应并行运行

[英]Control M cyclic jobs with same schedule should not run in parallel

I have a control M cyclic job A which runs every 40 mins from 8.30 am to 3 pm.我有一个控制 M 循环作业 A,它从早上 8 点 30 分到下午 3 点每 40 分钟运行一次。 I have to create a new cyclic job B which has to run from 9 am to 4 pm.我必须创建一个新的循环作业 B,它必须从上午 9 点运行到下午 4 点。 Job B should not run in parallel with job A. If job A fails, job B should still run and vice versa.作业 B 不应与作业 A 并行运行。如果作业 A 失败,作业 B 仍应运行,反之亦然。

What are the options I should give while creating job B.创建工作 B 时我应该提供哪些选项。

You could create a condition between jobs or just drag and drop arrow.您可以在作业之间创建条件或只是拖放箭头。 This way cyclic job B will only run when job A is completed这样循环作业 B 只会在作业 A 完成时运行

Add a control resource or quantitative resource which will prevent both jobs from executing at the same time.添加控制资源或定量资源,以防止两个作业同时执行。