A workspace is synced to a particular changelist A
. User makes changes in the workspace and submits the changes which shows up as changelist B
. Is there a way to figure out A
given B
?
Files must be synced to the head revision before they can be modified, so as far as the files in B
are considered, A
= B-1
.
There is no requirement that all of the files in a workspace be synced to the same changelist, or that they be synced at all, and there is no way to determine given B
what revision other files were synced to at the time B
was submitted.
The technical post webpages of this site follow the CC BY-SA 4.0 protocol. If you need to reprint, please indicate the site URL or the original address.Any question please contact:yoyou2525@163.com.