Is it possible to do an automatic refresh of data in a report that is linked to a SharePoint list / library on-premise? I mean without using a scheduled refresh
For on-premises SharePoint data you need the Data Gateway and automatic refresh of that data can only be achieved by a scheduled refresh set up in the Gateway.
The technical post webpages of this site follow the CC BY-SA 4.0 protocol. If you need to reprint, please indicate the site URL or the original address.Any question please contact:yoyou2525@163.com.