What are the steps to commit changeset 2 with the corrections back to TFS so we can create changeset 4? (the files are no longer marked as changed)
There are 2 options.
The first is to rollback the rollback . This has the downside of marking all the files as Rolled-Back.
The second is to do the "Get Specific Version" for C2 , copy the files that are changed out of source control. Perform a "Get Latest" and copy them back in. This could be a pain if this is a large changeset.
The technical post webpages of this site follow the CC BY-SA 4.0 protocol. If you need to reprint, please indicate the site URL or the original address.Any question please contact:yoyou2525@163.com.