简体   繁体   中英

What is the order of AR and MA?

I am unable to understand how to choose the order of AR and MA for ARIMA model. I am using Automatic ARIMA forecasting tool of E-views and it gives ARMA(2,4) but the output table shows p-values of these greater than 0.05.

You could take a look at the Information Criterion for different orders (for example in the range of [0, 5] ). The model which minimizes either the AIC or BIC is preferred.

The technical post webpages of this site follow the CC BY-SA 4.0 protocol. If you need to reprint, please indicate the site URL or the original address.Any question please contact:yoyou2525@163.com.

 
粤ICP备18138465号  © 2020-2024 STACKOOM.COM