简体   繁体   中英

Cleanup after all junit tests

In my project I have to do some repository setup before all tests. This is done using some tricky static rules. However I've got no clue how to do clean up after all the tests. I don't want to keep some magic static number referring the number of all test methods, which I should maintain all the time.

The most appreciated way is to add some listener which would be invoked after all the tests. Is there any interface for it already in JUnit4?


edit: this has nothing to do with @BeforeClass and @AfterClass, cause I have to know if method annotated with @AfterClass is invoked for the last time.

I'm using JUnit 4.9. Will this help?:

import junit.framework.TestCase;

import org.junit.AfterClass;
import org.junit.BeforeClass;
import org.junit.runner.RunWith;
import org.junit.runners.Suite;
import org.junit.runners.Suite.SuiteClasses;

@RunWith(Suite.class)
@SuiteClasses({First.class,Second.class,Third.class})
public class RunTestSuite extends TestCase {
    @BeforeClass
    public static void doYourOneTimeSetup() {
        ...
    }

    @AfterClass
    public static void doYourOneTimeTeardown() {
        ...
    }    
}

Edit: I am quite positive (unless I misunderstand your question) that my solution is what you are looking for. ie one teardown method after all your tests have ran. No listener required, JUnit has this facility. Thanks.

I recommend to use org.junit.runner.notification.RunListener , example:

public class TestListener extends RunListener {
  @Override
  public void testRunStarted(Description description) throws Exception {
     // Called before any tests have been run.
  }
  @Override
  public void testRunFinished(Result result) throws Exception {
     // Called when all tests have finished
  }
}

Read more directly in JUnit java doc. You can use that even with Maven's surefire (unit tests) plugin or failsafe plugin (integration tests) by adding following code into plugin configuration:

<properties>
  <property>
    <name>listener</name>
    <value>com.innovatrics.afismq.it.TestListener</value>
  </property>
</properties>

Just encountered the same problem.
My solution:

  • For a global set up: use (lazy) singleton to access something global that requires instantiation before the tests. The first test that accesses this singleton will trigger the global set up process.
  • For a global tear down: use a Java shutdown hook:
     Runtime.getRuntime().addShutdownHook(new Thread(() -> do_your_global_cleanup())));

You can always write your custom TestRunner. However, before you do that you need to evaluate the need for the same. It is better to use @BeforeClass and @AfterClass. Another example I can point to is, the fashion in which hibernate allows users to do unit testing using 'import.sql'.

No need to use suite, just add @BeforeClass, and @AfterClass as static

public class Tests {

    @BeforeClass
    public static void doYourOneTimeSetup()
    {
        ...
    }

    @AfterClass
    public static void doYourOneTimeTeardown() {
        ...
    }    

    @Test
    public void testYourTestcase()
    {
        ...
    }
}

The technical post webpages of this site follow the CC BY-SA 4.0 protocol. If you need to reprint, please indicate the site URL or the original address.Any question please contact:yoyou2525@163.com.

 
粤ICP备18138465号  © 2020-2024 STACKOOM.COM