I have made a user flow diagram but just wanted to ask you guys about clarification on displaying "tracking".
Let's say these are the requirements
What would be the correct way of showing step number 3 i n my user flow diagram?
Please see screenshot below and let me know of any suggestions
Thank you in advance!
A data-flow diagram differs from ordinary flow-charts: instead of arrows showing the control flow (sequence of actions and decisions), the arrow should correspond to data moving from one function to the other. On each arrow you should be able to write the data that is transmitted.
If a product is tracked with analytics, the arrow to Google tracking
would probably be a product. The question then is:
Google tracking
return something to selects product
? In this case an arrow in the opposite direction is missing (for the response).Google tracking
to exploit the tracking? This function would be missing.Google tracking
considered to be some data store that would be read elsewhere.Does the selects product
get the product selected from the web page ? Or is this something that receives data from the user? Or is it in fact a part of your webpage?
On the symbols, the main DFD notations use circles instead of boxes, or rounded rectangles. The diamond and the circle here look like flow-chart diagram symbols and are confusing.
The technical post webpages of this site follow the CC BY-SA 4.0 protocol. If you need to reprint, please indicate the site URL or the original address.Any question please contact:yoyou2525@163.com.