When I try to create or alter stored procedures, it automatically disconnects dbserver.
It only does so for stored procedure create,alter.
This is the error I get:
A transport-level error has occurred when receiving results from the server. (provider: TCP Provider, error: 0 - The semaphore timeout period has expired.)
How can I solve this issue?
The technical post webpages of this site follow the CC BY-SA 4.0 protocol. If you need to reprint, please indicate the site URL or the original address.Any question please contact:yoyou2525@163.com.